Berlin HVAC Upgrade
Critical Infrastructure
- Removal of existing HVAC system
- Temporary cooling installation to maintain temperature for critical equipment
- Concrete pad installation
- HVAC system procurement
- Mechanical installation
- Power & control installation
Location: Berlin, VT
Engineering: Plan/Spec Prime contactor
Market Sector: Critical power and infrastructure
Year started: 2017–2018
Duration: 5 Months