• Removal of existing HVAC system
  • Temporary cooling installation to maintain temperature for critical equipment
  • Concrete pad installation
  • HVAC system procurement
  • Mechanical installation
  • Power & control installation
Location: Berlin, VT
Engineering: Plan/Spec Prime contactor
Market Sector: Critical power and infrastructure
Year started: 2017–2018
Duration: 5 Months