Distribution Center – Fluid Line
Industrial
The project consists of the rework of two existing 2500A services to facilitate the installation of additional material handling conveyor as well as provide the capability for whole-building generator backup. Elm was able to offer value engineering on the project by utilizing a 3000A feeder bus, which offered labor and material savings versus traditional pipe and wire on the 1400’ relocation of an existing service. Elm was able to complete the work 3 months ahead of project schedule.
- Installation of two Kohler 2500A automatic transfer switches
- Installation of Trystar generator docking station
- Facilitated installation of custom tap sections on existing switchgear
- Installation of two Square D 2500A switchgears
- Installation of 1,400’ of 3000A feeder bus with zero interruptions to building production
- Installation of fourteen 200A control panel feeds
- Installation of new under-platform lighting & fire alarm
Location: Westfield, MA
Engineering: Plan and Spec
Market Sector: Industrial, Distribution Center
Year started: 2019
Duration: 4 Months