• Drilling & grouting of two 500’ grounding wells
  • Site ground grid installation
  • 25kv medium-voltage URD installation
  • 2-2750kVa pad-mounted, oil-filled transformers
  • 690v low-voltage feeders to wind turbine PCUs
  • Power, control & fiber optic installation in two Goldwind 2.5MW wind turbines
  • NETA ATS testing of transformers & 25kv cable/terminations installation
Read More
Location: Russell, MA
Engineering: Pan and Spec
Market Sector: Renewable Energy, Wind
Year started: 2019
Duration: 4 Months