• Installation of approx. 4,500’ overhead distribution on twenty-two 45’ Class 2 wooden poles
  • Installation of all associated hardware, conductors, insulators, grounding & guying materials into rock & ledge
  • Installation of 2-25kV gang-operated load break switches
  • Installation of 1-25kV primary metering bank
  • Providing and installation of 25kV URD feeders to pad mounted oil-filled transformers
  • Completion of all terminations & grounding & providing of testing of 25kv cables & terminations to NETA acceptance testing standards
Read More
Location: Littleton/Boxborough, MA
Engineering: Plan and Spec
Market Sector: Medium Voltage, Renewable Energy, Overhead Distribution, Underground Distribution
Year started: 2018
Duration: 2 Months