The project consists of the rework of two existing 2500A services to facilitate the installation of additional material handling conveyor as well as provide the capability for whole-building generator backup. Elm was able to offer value engineering on the project by utilizing a 3000A feeder bus, which offered labor and material savings versus traditional pipe and wire on the 1400’ relocation of an existing service. Elm was able to complete the work 3 months ahead of project schedule.

  • Installation of two Kohler 2500A automatic transfer switches
  • Installation of Trystar generator docking station
  • Facilitated installation of custom tap sections on existing switchgear
  • Installation of two Square D 2500A switchgears
  • Installation of 1,400’ of 3000A feeder bus with zero interruptions to building production
  • Installation of fourteen 200A control panel feeds
  • Installation of new under-platform lighting & fire alarm
Location: Westfield, MA
Engineering: Plan and Spec
Market Sector: Industrial, Distribution Center
Year started: 2019
Duration: 4 Months